Triple
T35632984
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | C line (Los Angeles Railway) |
E1029637
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former public transit route |
C15590
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former public transit route Context triple: [C line (Los Angeles Railway), instanceOf, former public transit route]
-
A.
former transit line
chosen
A former transit line is a previously operational public transportation route, such as a bus, tram, or rail line, that has been permanently discontinued or replaced.
-
B.
former transit system
A former transit system is a previously operational network of public transportation services—such as buses, trains, or trams—that has been discontinued, dismantled, or replaced.
-
C.
local bus route
A local bus route is a designated path within a limited geographic area along which buses operate on a regular schedule to transport passengers between specific stops.
-
D.
former Los Angeles Metro Rail line
A former Los Angeles Metro Rail line is a previously operated light rail or rapid transit route within the Los Angeles Metro Rail system that has since been discontinued, restructured, or replaced.
-
E.
San Francisco Municipal Railway route
A San Francisco Municipal Railway route is a defined public transit line, identified by a number or letter, that specifies the path, stops, and service pattern followed by Muni vehicles within the San Francisco transit network.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e07bb0c8190968ea2d836fc42c9 |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:05 p.m.