Triple

T35621471
Position Surface form Disambiguated ID Type / Status
Subject Hopkins Township, Whiteside County, Illinois E1029321 entity
Predicate roadMaintenanceResponsibility P26299 FINISHED
Object township roads LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: township roads | Statement: [Hopkins Township, Whiteside County, Illinois, roadMaintenanceResponsibility, township roads]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: roadMaintenanceResponsibility
Context triple: [Hopkins Township, Whiteside County, Illinois, roadMaintenanceResponsibility, township roads]
  • A. transportInfrastructureResponsibility
    Indicates responsibility for the planning, development, maintenance, or management of transport infrastructure such as roads, railways, ports, or related facilities.
  • B. safetyResponsibilityOf
    Indicates that one entity holds responsibility for ensuring the safety of another entity or context.
  • C. roadConstruction
    Indicates that construction work is being carried out on a road, typically involving building, repairing, or modifying the roadway infrastructure.
  • D. roadSystemRole
    Indicates the specific functional role or responsibility an entity has within a road or transportation network system.
  • E. maintenanceAuthority chosen
    Indicates that one entity has the responsibility or official power to maintain, service, or keep another entity in proper working condition.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e0709408190bbe322bf1707ef6b completed May 3, 2026, 3:47 p.m.
NER Named-entity recognition batch_69f79ef1914c8190a293c37fef343a6d completed May 3, 2026, 7:16 p.m.
PD Predicate disambiguation batch_69f79e4bdbcc8190be7a0d2cf8a77b64 completed May 3, 2026, 7:13 p.m.
Created at: May 3, 2026, 4:05 p.m.