Triple

T35602903
Position Surface form Disambiguated ID Type / Status
Subject Maintenance Domain E1028803 entity
Predicate instanceOf P0 FINISHED
Object Ethernet OAM concept C32663 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Ethernet OAM concept
Context triple: [Maintenance Domain, instanceOf, Ethernet OAM concept]
  • A. Ethernet OAM standard chosen
    The Ethernet OAM standard defines protocols and mechanisms for monitoring, fault management, and performance management in Ethernet networks to ensure reliable and maintainable service operation.
  • B. Connectivity Fault Management standard
    The Connectivity Fault Management standard defines protocols and mechanisms for detecting, isolating, and managing connectivity faults in Ethernet and packet-based networks to ensure reliable end-to-end service.
  • C. Ethernet fronthaul standard
    An Ethernet fronthaul standard defines the protocols, interfaces, and performance requirements for transporting radio access network (RAN) traffic between distributed radio units and centralized baseband units over Ethernet-based networks.
  • D. network management protocol
    A network management protocol is a standardized set of rules and procedures that enables monitoring, configuring, and controlling devices and services within a computer network.
  • E. IEEE 802.21 feature set
    The IEEE 802.21 feature set comprises mechanisms and protocols that enable seamless media-independent handover and service continuity across heterogeneous wireless and wired networks.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e0653ec81909b1b813c126c6574 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:05 p.m.