Triple
T35580174
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shivanasamudra |
E1028198
|
entity |
| Predicate | hydroelectricPlantBuiltFor |
P136372
|
FINISHED |
| Object | supplying power to Kolar Gold Fields |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: supplying power to Kolar Gold Fields | Statement: [Shivanasamudra, hydroelectricPlantBuiltFor, supplying power to Kolar Gold Fields]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hydroelectricPlantBuiltFor Context triple: [Shivanasamudra, hydroelectricPlantBuiltFor, supplying power to Kolar Gold Fields]
-
A.
hydroelectricStationCommissioned
Indicates that a hydroelectric power station has been officially brought into operation or service on a specific date or in a specific context.
-
B.
hasHydropowerRoleIn
chosen
Indicates that an entity plays a specific role or function related to hydropower within the context of another entity, project, or activity.
-
C.
isHydroelectricallyDeveloped
Indicates that an entity has been developed to generate electricity using hydropower infrastructure or facilities.
-
D.
hydropowerProjectType
Indicates the specific category or type of a hydropower project associated with an entity.
-
E.
hasHydroelectricProject
Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e0386688190b931bacdc145938c |
completed | May 3, 2026, 3:47 p.m. |
| NER | Named-entity recognition | batch_69f7a34f8ee08190a040304635539a8f |
completed | May 3, 2026, 7:34 p.m. |
| PD | Predicate disambiguation | batch_69f7a06f125c8190843af194f042a465 |
completed | May 3, 2026, 7:22 p.m. |
Created at: May 3, 2026, 4:04 p.m.