Triple
T35540636
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lusitania-class ocean liners |
E1027049
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | class of passenger ships |
C26795
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: class of passenger ships Context triple: [Lusitania-class ocean liners, instanceOf, class of passenger ships]
-
A.
class of ships
chosen
A class of ships is a group of vessels built to a common design, sharing similar dimensions, capabilities, and intended roles within a navy or fleet.
-
B.
Spirit-class ferry
The Spirit-class ferry is a large, double-ended passenger and vehicle vessel designed for high-capacity, short- to medium-distance coastal and inter-island routes.
-
C.
passenger ship fleet
A passenger ship fleet is a coordinated group of vessels operated under common management to transport people across waterways for travel, tourism, or commuting.
-
D.
passenger and mail steamer
A passenger and mail steamer is a steam-powered vessel designed to transport people and postal cargo on scheduled routes across seas, rivers, or coastal waters.
-
E.
planned passenger ship
A planned passenger ship is a proposed or under-development vessel designed to transport people by sea, defined by its intended capacity, amenities, and operational routes but not yet completed or in service.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e008ba08190927acd8e5e0344c8 |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:04 p.m.