Triple
T35540548
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Southampton–New York City |
E1027047
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | passenger liner route |
C2569
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: passenger liner route Context triple: [Southampton–New York City, instanceOf, passenger liner route]
-
A.
sea route
chosen
A sea route is a navigable path across seas or oceans used by ships to travel between ports for trade, transport, or exploration.
-
B.
ocean liner
An ocean liner is a large, robust passenger ship designed for regular long-distance sea voyages, typically across oceans, with an emphasis on speed, safety, and comfort rather than leisure amenities alone.
-
C.
transportation route
A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
-
D.
passenger-only ferry route
A passenger-only ferry route is a scheduled waterway service that transports people, but not vehicles or freight, between designated terminals or ports.
-
E.
planned passenger ship
A planned passenger ship is a proposed or under-development vessel designed to transport people by sea, defined by its intended capacity, amenities, and operational routes but not yet completed or in service.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e008ba08190927acd8e5e0344c8 |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:04 p.m.