Triple
T35537708
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | RIIO-ED2 |
E1026974
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electricity distribution price control |
C9634
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electricity distribution price control Context triple: [RIIO-ED2, instanceOf, electricity distribution price control]
-
A.
electricity market
An electricity market is a system in which electricity is traded as a commodity through competitive buying and selling, balancing supply and demand in real time while determining prices for generation, transmission, and consumption.
-
B.
electricity supply industry
The electricity supply industry encompasses the generation, transmission, distribution, and retail of electrical power from producers to end users, ensuring reliable and efficient energy delivery.
-
C.
Electricity regulatory commission
An electricity regulatory commission is a governing body that oversees, regulates, and enforces policies for the generation, transmission, distribution, and pricing of electrical power to ensure reliability, fairness, and consumer protection.
-
D.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
E.
price control law
chosen
A price control law is a legal regulation that sets maximum or minimum prices for goods or services to influence market outcomes and protect consumers or producers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dff7e508190b28ceeee770dce23 |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:04 p.m.