Triple

T35531895
Position Surface form Disambiguated ID Type / Status
Subject Boguchany Dam E1026819 entity
Predicate primaryElectricityConsumer GENERATED
Object aluminium industry UNRECOGNIZED GENERATED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: primaryElectricityConsumer
Context triple: [Boguchany Dam, primaryElectricityConsumer, aluminium industry]
  • A. electricityUse
    Indicates the amount or pattern of electrical energy consumed by an entity during a specified period or activity.
  • B. usesElectricityFor
    Indicates that one entity relies on or employs electricity as the power source to operate, perform a function, or carry out an activity for another entity or purpose.
  • C. electricityRole chosen
    Indicates the functional role or involvement an entity has in the production, transmission, distribution, or use of electricity in relation to another entity or process.
  • D. usesElectricityStandard
    Indicates that one entity operates according to, or is compatible with, the electricity supply standard defined or used by another entity.
  • E. electrificationUsedFor
    Indicates that electrification is employed as a means or method to achieve, enable, or support a particular function, process, or purpose.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dff7e508190b28ceeee770dce23 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:04 p.m.