Triple

T35523452
Position Surface form Disambiguated ID Type / Status
Subject Simplified Technical English E1026605 entity
Predicate instanceOf P0 FINISHED
Object technical writing standard C29046 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: technical writing standard
Context triple: [Simplified Technical English, instanceOf, technical writing standard]
  • A. technical writer
    A technical writer is a professional who creates clear, concise, and user-focused documentation that explains complex technical information to specific audiences.
  • B. academic writing standard
    Academic writing standard is a set of formal conventions and criteria that govern clarity, structure, evidence use, and citation practices in scholarly texts.
  • C. technical text
    A technical text is a written document that explains, instructs, or reports on specialized subjects using precise, domain-specific language intended for readers with some level of technical knowledge.
  • D. technical standard concept chosen
    A technical standard concept is a formally defined specification or guideline that establishes uniform criteria, methods, or requirements to ensure compatibility, safety, quality, and interoperability across technologies, systems, or processes.
  • E. publishing standard
    A publishing standard is an agreed-upon set of rules and guidelines that define how content is formatted, structured, and shared across publishing systems to ensure consistency, interoperability, and quality.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dfe78b081908e2b14cb88dd8c00 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:04 p.m.