Triple

T35517882
Position Surface form Disambiguated ID Type / Status
Subject 2002–03 Arsenal season E1026466 entity
Predicate finishedBehind P78201 FINISHED
Object Manchester United F.C. NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Manchester United F.C. | Statement: [2002–03 Arsenal season, finishedBehind, Manchester United F.C.]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finishedBehind
Context triple: [2002–03 Arsenal season, finishedBehind, Manchester United F.C.]
  • A. finishedAheadOf
    Indicates that one entity completed an event, task, or process before another entity, ranking or finishing in a superior or earlier position.
  • B. finished
    Indicates that an entity has completed an action, process, or state, reaching its end point.
  • C. finishedBehindTeam chosen
    Indicates that one team completed a competition, race, or ranking-based event in a lower (worse) position than another specified team.
  • D. completedAfter
    Indicates that one event or task was finished at a later time than another specified event or task.
  • E. finish
    Indicates that an entity brings an action, process, or state to an end or completion.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dfe78b081908e2b14cb88dd8c00 completed May 3, 2026, 3:47 p.m.
NER Named-entity recognition batch_69f79a54aa3c8190b2bb5d790b2d42d4 completed May 3, 2026, 6:56 p.m.
PD Predicate disambiguation batch_69f7961970408190b669cc556e30a608 completed May 3, 2026, 6:38 p.m.
Created at: May 3, 2026, 4:04 p.m.