Triple

T35511051
Position Surface form Disambiguated ID Type / Status
Subject Railroad (Fallout 4) E1026285 entity
Predicate factionEndingAvailable P184646 FINISHED
Object yes LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: yes | Statement: [Railroad (Fallout 4), factionEndingAvailable, yes]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: factionEndingAvailable
Context triple: [Railroad (Fallout 4), factionEndingAvailable, yes]
  • A. hasUnfinishedEnding
    Indicates that an entity concludes in an incomplete, unresolved, or open-ended manner rather than reaching a fully finished state.
  • B. hasFinale
    Indicates that one entity serves as the concluding or final part (such as an ending segment, episode, or event) of another entity.
  • C. alternateEnding
    Indicates that one version of a work provides a different conclusion or final sequence of events compared to the original or primary ending.
  • D. canConclude
    Indicates that one entity is able to logically derive or reach a conclusion about another entity or situation.
  • E. finalAct
    Indicates that an action or event is the last or concluding act in a sequence or process.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dfd61208190b93ec6dc439cab41 completed May 3, 2026, 3:47 p.m.
NER Named-entity recognition batch_69f7b365288c8190bcb11fcfba028737 completed May 3, 2026, 8:43 p.m.
PD Predicate disambiguation batch_69f7b1b8a9fc8190a1279e67a2d12707 completed May 3, 2026, 8:36 p.m.
PDg Predicate description generation batch_69f7b2f2b9ac8190aa05b8a1aa18ec2d completed May 3, 2026, 8:41 p.m.
Created at: May 3, 2026, 4:04 p.m.