Triple

T35482943
Position Surface form Disambiguated ID Type / Status
Subject 復興橋 E1025515 entity
Predicate instanceOf P0 FINISHED
Object 交通基礎設施 C2978 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 交通基礎設施
Context triple: [復興橋, instanceOf, 交通基礎設施]
  • A. road infrastructure chosen
    Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
  • B. transport infrastructure network
    A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
  • C. transport infrastructure name
    A transport infrastructure name identifies a specific facility or network element used for the movement of people or goods, such as a road, railway line, airport, or port.
  • D. entidad de infraestructura vial
    Entidad de infraestructura vial es una organización pública o privada responsable de la planificación, construcción, operación, mantenimiento y gestión de las redes y servicios de transporte terrestre, como carreteras, puentes y túneles.
  • E. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dfbcdd881908c7b0b6bc502252b completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:04 p.m.