Triple

T35478561
Position Surface form Disambiguated ID Type / Status
Subject IFIP Working Group 2.5 E1025404 entity
Predicate instanceOf P0 FINISHED
Object specialist group C48235 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: specialist group
Context triple: [IFIP Working Group 2.5, instanceOf, specialist group]
  • A. specialized group
    A specialized group is a collection of individuals organized around a specific expertise, function, or shared interest to achieve focused goals or perform distinct tasks.
  • B. specialist unit
    A specialist unit is a dedicated organizational subgroup composed of experts and specialized resources focused on performing specific, complex, or high-priority tasks within a broader system or institution.
  • C. specialist site
    A specialist site is a focused web platform dedicated to in-depth information, services, or products within a specific niche or professional domain.
  • D. committee of experts chosen
    A committee of experts is a formally organized group of individuals with specialized knowledge or skills who collaboratively analyze issues, provide informed advice, and make or recommend decisions within a defined domain.
  • E. specialist corps
    A specialist corps is a dedicated group of highly trained experts within a larger organization or system, formed to perform complex, technical, or niche tasks that require advanced, domain-specific skills.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dfadba0819083456aadcd6864ea completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:04 p.m.