Triple
T35468865
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Teton Dam failure flooding |
E1025153
|
entity |
| Predicate | damCompletionStatusAtFailure |
P173271
|
FINISHED |
| Object | nearly completed but reservoir still filling |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: nearly completed but reservoir still filling | Statement: [Teton Dam failure flooding, damCompletionStatusAtFailure, nearly completed but reservoir still filling]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: damCompletionStatusAtFailure Context triple: [Teton Dam failure flooding, damCompletionStatusAtFailure, nearly completed but reservoir still filling]
-
A.
completionOfAssociatedDam
chosen
Indicates the completion status or occurrence of finishing construction or development of a related dam.
-
B.
damState
Indicates the operational or physical condition a dam is currently in, such as its status, integrity, or level of functionality.
-
C.
completedWithDam
Indicates that an action, project, or process was completed through the use or involvement of a dam.
-
D.
drainageCompletedIn
Indicates that the process of draining (e.g., water or fluid removal) was fully completed within a specified time, place, or context.
-
E.
laterDamCompletionDate
Indicates that one dam’s completion date occurs chronologically after another dam’s completion date.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dfa20d0819089585dc2cf653aea |
completed | May 3, 2026, 3:47 p.m. |
| NER | Named-entity recognition | batch_69f79da9f80c8190b0afd8509f28747b |
completed | May 3, 2026, 7:10 p.m. |
| PD | Predicate disambiguation | batch_69f79617d40481909ba372f94209c08b |
completed | May 3, 2026, 6:38 p.m. |
Created at: May 3, 2026, 4:04 p.m.