Triple

T35406289
Position Surface form Disambiguated ID Type / Status
Subject BOSH E1023370 entity
Predicate instanceOf P0 FINISHED
Object release engineering toolchain C9685 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: release engineering toolchain
Context triple: [BOSH, instanceOf, release engineering toolchain]
  • A. software build and distribution system chosen
    A software build and distribution system automates compiling source code, packaging artifacts, and delivering them reliably to target environments or end users.
  • B. progressive delivery tool
    A progressive delivery tool is a system that enables controlled, incremental rollouts of software changes—such as canary releases, feature flags, and blue-green deployments—while monitoring impact and allowing rapid rollback to reduce release risk.
  • C. developer tool
    A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
  • D. change management tool
    A change management tool is a software system that helps organizations plan, track, approve, and communicate changes to processes, systems, or infrastructure in a controlled and auditable way.
  • E. software release
    A software release is a specific, packaged version of a software product that is formally delivered to users, typically including new features, fixes, and documentation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76df43ca4819098711ca4370f1bb9 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:03 p.m.