Triple
T35406289
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | BOSH |
E1023370
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | release engineering toolchain |
C9685
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: release engineering toolchain Context triple: [BOSH, instanceOf, release engineering toolchain]
-
A.
software build and distribution system
chosen
A software build and distribution system automates compiling source code, packaging artifacts, and delivering them reliably to target environments or end users.
-
B.
progressive delivery tool
A progressive delivery tool is a system that enables controlled, incremental rollouts of software changes—such as canary releases, feature flags, and blue-green deployments—while monitoring impact and allowing rapid rollback to reduce release risk.
-
C.
developer tool
A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
-
D.
change management tool
A change management tool is a software system that helps organizations plan, track, approve, and communicate changes to processes, systems, or infrastructure in a controlled and auditable way.
-
E.
software release
A software release is a specific, packaged version of a software product that is formally delivered to users, typically including new features, fixes, and documentation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76df43ca4819098711ca4370f1bb9 |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:03 p.m.