Triple

T35336075
Position Surface form Disambiguated ID Type / Status
Subject NTPC Auraiya gas power plant E1020455 entity
Predicate instanceOf P0 FINISHED
Object natural gas-based thermal power plant C14265 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: natural gas-based thermal power plant
Context triple: [NTPC Auraiya gas power plant, instanceOf, natural gas-based thermal power plant]
  • A. coal-fired power station
    A coal-fired power station is an industrial facility that burns coal to produce steam, which drives turbines connected to generators to produce electricity, while emitting significant air pollutants and greenhouse gases.
  • B. electric power station chosen
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • C. gas plant
    A gas plant is an industrial facility that processes raw natural gas to remove impurities and separate it into marketable products such as pipeline-quality gas and natural gas liquids.
  • D. natural gas utility
    A natural gas utility is a regulated service provider that supplies, transports, and distributes natural gas to residential, commercial, and industrial customers through an integrated pipeline infrastructure.
  • E. natural gas field
    A natural gas field is a subsurface accumulation of natural gas trapped in porous rock formations, typically exploited through drilling and production infrastructure for commercial energy use.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76debb4e08190be52d89b8af2392d completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:03 p.m.