Triple

T35318884
Position Surface form Disambiguated ID Type / Status
Subject Chūō Shinkansen E1019981 entity
Predicate plannedOpeningPhase2 P172900 FINISHED
Object after completion of Tokyo–Nagoya section LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: after completion of Tokyo–Nagoya section | Statement: [Chūō Shinkansen, plannedOpeningPhase2, after completion of Tokyo–Nagoya section]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedOpeningPhase2
Context triple: [Chūō Shinkansen, plannedOpeningPhase2, after completion of Tokyo–Nagoya section]
  • A. phase2Opening chosen
    Indicates the initiation or start of a second phase or stage in a process, sequence, or operation.
  • B. plannedOpeningPeriod
    Indicates the time span during which something is scheduled or intended to open or begin operating.
  • C. phasedOpening
    Indicates that the opening or launch of something occurs in multiple planned stages or phases rather than all at once.
  • D. phase1OpeningDate
    Indicates the date on which the first phase of a project, development, or initiative is officially opened or begins operation.
  • E. plannedOpeningDate
    Indicates the date on which something is scheduled or intended to begin operating or become available.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76de9d45c81908a2ed0956b448b65 completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69fd09840ea88190a2e6d7e577ade717 completed May 7, 2026, 9:52 p.m.
PD Predicate disambiguation batch_69fd064c49988190afadddbd04d7cb94 completed May 7, 2026, 9:38 p.m.
Created at: May 3, 2026, 4:03 p.m.