Triple

T35312140
Position Surface form Disambiguated ID Type / Status
Subject Siberian Unified Power System E1019800 entity
Predicate instanceOf P0 FINISHED
Object regional power system C27230 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional power system
Context triple: [Siberian Unified Power System, instanceOf, regional power system]
  • A. regional transmission organization chosen
    A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
  • B. national grid system
    A national grid system is a standardized framework of coordinates and infrastructure used to generate, transmit, and distribute electricity reliably across a country.
  • C. balance of power system
    A balance of power system is an international relations arrangement in which states form shifting alliances and counterweights so that no single actor becomes dominant enough to threaten the independence or security of the others.
  • D. power-generation region
    A power-generation region is a geographic area or zone designated for producing electrical energy, typically characterized by concentrated energy infrastructure such as power plants, renewable installations, and associated transmission facilities.
  • E. regional institutional system
    A regional institutional system is a coordinated network of organizations, rules, and practices within a specific geographic area that collectively shape governance, economic activity, and social outcomes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76de9d45c81908a2ed0956b448b65 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:03 p.m.