Triple
T35270530
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | San Miguel Corporation Infrastructure |
E1018653
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure company division |
C62600
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure company division Context triple: [San Miguel Corporation Infrastructure, instanceOf, infrastructure company division]
-
A.
energy company division
A specialized organizational unit within an energy company responsible for managing a distinct set of activities, assets, or markets such as generation, transmission, distribution, or retail services.
-
B.
infrastructure management company
An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
-
C.
asset management company division
A division of an asset management company is an organizational unit responsible for managing specific types of investment products, client segments, or geographic markets within the broader firm.
-
D.
semiconductor company division
A semiconductor company division is an organizational unit within a semiconductor firm responsible for specific product lines, technologies, or market segments, managing everything from design and development to marketing and support for its assigned portfolio.
-
E.
infrastructure finance company
An infrastructure finance company is a financial institution that provides long-term funding, credit support, and advisory services for the development, operation, and maintenance of large-scale public and private infrastructure projects.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76de5c4788190896ad598ae7d6bc6 |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:02 p.m.