Triple

T35226670
Position Surface form Disambiguated ID Type / Status
Subject Key West–Havana steamship service E1017116 entity
Predicate instanceOf P0 FINISHED
Object transport link between the United States and Cuba C65930 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport link between the United States and Cuba
Context triple: [Key West–Havana steamship service, instanceOf, transport link between the United States and Cuba]
  • A. bridge in the Florida Keys
    A bridge in the Florida Keys is a long, low-span structure connecting the chain of islands across clear, shallow ocean waters, enabling vehicular travel along the Overseas Highway.
  • B. U.S.–Mexico border crossing
    A U.S.–Mexico border crossing is a designated point of entry where people, vehicles, and goods are inspected and processed as they legally move between the United States and Mexico.
  • C. Panama Canal infrastructure
    Panama Canal infrastructure encompasses the system of locks, channels, dams, ports, support facilities, and control technologies that enable the transit, management, and maintenance of maritime traffic through the Panama Canal.
  • D. bridge in Miami
    A bridge in Miami is a structural crossing, often spanning waterways or highways, designed to support vehicular, pedestrian, or rail traffic while withstanding the region’s coastal climate and environmental conditions.
  • E. Puerto Rico highway
    A Puerto Rico highway is a numbered public road within the Puerto Rico highway and transportation network designed to facilitate vehicular travel between municipalities, regions, and key destinations across the island.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76de12e4c8190bc46b71a32858356 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:02 p.m.