Triple

T3521591
Position Surface form Disambiguated ID Type / Status
Subject 1060 Project E74433 entity
Predicate instanceOf P0 FINISHED
Object stadium renovation project C5246 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: stadium renovation project
Context triple: [1060 Project, instanceOf, stadium renovation project]
  • A. architectural renovation project chosen
    An architectural renovation project is a coordinated effort to redesign, upgrade, and adapt an existing building or space to meet new functional, aesthetic, regulatory, and sustainability requirements while preserving or enhancing its structural integrity and character.
  • B. multi-purpose stadium
    A multi-purpose stadium is a large, versatile venue designed to host a variety of events, such as sports games, concerts, and community gatherings, by accommodating different configurations and audiences.
  • C. sports venue
    A sports venue is a designated facility or location equipped to host organized athletic events, competitions, and related spectator activities.
  • D. stadium authority
    A stadium authority is an organization, typically public or quasi-public, responsible for owning, managing, financing, and overseeing the operation and development of a sports or entertainment stadium and its surrounding facilities.
  • E. architectural remodeling project
    An architectural remodeling project is a coordinated effort to redesign, upgrade, or reconfigure an existing structure’s spaces, systems, and aesthetics to better meet current functional, regulatory, and stylistic requirements.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85d0c5488190a3d8e02ebd01a1aa completed March 8, 2026, 2:21 p.m.
Created at: March 8, 2026, 3:19 p.m.