Triple
T3521591
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 1060 Project |
E74433
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | stadium renovation project |
C5246
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: stadium renovation project Context triple: [1060 Project, instanceOf, stadium renovation project]
-
A.
architectural renovation project
chosen
An architectural renovation project is a coordinated effort to redesign, upgrade, and adapt an existing building or space to meet new functional, aesthetic, regulatory, and sustainability requirements while preserving or enhancing its structural integrity and character.
-
B.
multi-purpose stadium
A multi-purpose stadium is a large, versatile venue designed to host a variety of events, such as sports games, concerts, and community gatherings, by accommodating different configurations and audiences.
-
C.
sports venue
A sports venue is a designated facility or location equipped to host organized athletic events, competitions, and related spectator activities.
-
D.
stadium authority
A stadium authority is an organization, typically public or quasi-public, responsible for owning, managing, financing, and overseeing the operation and development of a sports or entertainment stadium and its surrounding facilities.
-
E.
architectural remodeling project
An architectural remodeling project is a coordinated effort to redesign, upgrade, or reconfigure an existing structure’s spaces, systems, and aesthetics to better meet current functional, regulatory, and stylistic requirements.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85d0c5488190a3d8e02ebd01a1aa |
completed | March 8, 2026, 2:21 p.m. |
Created at: March 8, 2026, 3:19 p.m.