Triple

T35133399
Position Surface form Disambiguated ID Type / Status
Subject Polhem Dock E1014502 entity
Predicate instanceOf P0 FINISHED
Object 18th-century structure C9591 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 18th-century structure
Context triple: [Polhem Dock, instanceOf, 18th-century structure]
  • A. 18th-century building chosen
    An 18th-century building is a structure constructed between 1701 and 1800 that typically reflects the architectural styles, materials, and construction techniques of that period, such as Georgian, Baroque, or Neoclassical design.
  • B. 18th-century residence
    An 18th-century residence is a dwelling built or styled in the architectural traditions of the 1700s, typically featuring symmetrical facades, period-appropriate materials, and interior layouts reflecting the social and domestic norms of the era.
  • C. 18th-century architectural project
    An 18th-century architectural project is a designed building or complex conceived and planned during the 1700s, reflecting the period’s prevailing styles, construction techniques, and cultural or political ideals.
  • D. 18th-century building remodeling
    18th-century building remodeling involves the alteration, restoration, or adaptive reuse of structures originally built in the 1700s, balancing historical authenticity with contemporary functional and regulatory requirements.
  • E. 18th-century architectural alteration
    An 18th-century architectural alteration is a modification or addition made to an existing building during the 1700s that reflects the design principles, materials, and stylistic trends of that period.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dd9c1848190af70d4882a2c1ad7 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:02 p.m.