Triple
T3511785
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mandi |
E74210
|
entity |
| Predicate | locatedNear |
P294
|
FINISHED |
| Object | Pandoh Dam |
E100573
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pandoh Dam | Statement: [Mandi, locatedNear, Pandoh Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Pandoh Dam Context triple: [Mandi, locatedNear, Pandoh Dam]
-
A.
Pandoh Dam
chosen
Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
-
B.
Karcham Wangtoo Dam
Karcham Wangtoo Dam is a major hydroelectric gravity dam in Himachal Pradesh, India, known for its large underground power station harnessing the Sutlej River in the Himalayas.
-
C.
Wayatinah Dam
Wayatinah Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s major power generation scheme.
-
D.
Wlingi Dam
Wlingi Dam is a hydroelectric and irrigation dam located on the Brantas River in East Java, Indonesia.
-
E.
Pangue Dam
Pangue Dam is a major hydroelectric power facility in Chile, built on the Biobío River to generate electricity and support the country’s energy needs.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad85cfb5c881909c9a2edd9d6043cc |
completed | March 8, 2026, 2:21 p.m. |
| NER | Named-entity recognition | batch_69adbc10b6b48190bedfed6d34afc425 |
completed | March 8, 2026, 6:12 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b402d3a06481908e512c09306a2566 |
completed | March 13, 2026, 12:28 p.m. |
Created at: March 8, 2026, 3:19 p.m.