Triple

T35098286
Position Surface form Disambiguated ID Type / Status
Subject Los Angeles E1012928 entity
Predicate waterPolicyConcern P195161 FINISHED
Object Colorado River allocation LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Colorado River allocation | Statement: [Los Angeles, waterPolicyConcern, Colorado River allocation]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: waterPolicyConcern
Context triple: [Los Angeles, waterPolicyConcern, Colorado River allocation]
  • A. waterUseAffects
    Indicates that one entity’s use of water has an impact or influence on another entity or condition.
  • B. waterQualityIssues
    Indicates that there are problems or concerns with the condition, safety, or suitability of a water source.
  • C. waterQualityProtection
    Indicates efforts, measures, or responsibilities aimed at preserving or improving the cleanliness, safety, and ecological integrity of water resources.
  • D. waterManagementDependence
    Indicates that one entity’s ability to manage water resources (such as supply, quality, or distribution) relies on or is significantly influenced by another entity.
  • E. waterManagementAuthority
    Indicates that an entity has official responsibility for overseeing, regulating, or managing water resources, services, or infrastructure for a given area or system.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dd556248190808b4c4f43debebb completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69fda94697c4819081291967202248be completed May 8, 2026, 9:13 a.m.
PD Predicate disambiguation batch_69fda5973fcc8190a57daef31fb70a49 completed May 8, 2026, 8:57 a.m.
PDg Predicate description generation batch_69fda945e1e08190bf923fcd4d2c548a completed May 8, 2026, 9:13 a.m.
Created at: May 3, 2026, 4:01 p.m.