Triple

T35093746
Position Surface form Disambiguated ID Type / Status
Subject Lantau Link E1012806 entity
Predicate instanceOf P0 FINISHED
Object bridge-and-tunnel roadway system C15053 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge-and-tunnel roadway system
Context triple: [Lantau Link, instanceOf, bridge-and-tunnel roadway system]
  • A. bridge–tunnel complex chosen
    A bridge–tunnel complex is an integrated transportation structure that combines bridge spans and underwater tunnels to carry traffic across wide bodies of water or other large obstacles.
  • B. combined road and rail bridge–tunnel
    A combined road and rail bridge–tunnel is a hybrid transportation structure that integrates both bridge and tunnel segments to carry vehicular and rail traffic across or under a geographic obstacle such as a body of water or valley.
  • C. toll bridge system
    A toll bridge system is a coordinated set of hardware, software, and procedures that manages vehicle identification, fee calculation, payment processing, and access control for crossing a bridge.
  • D. road and rail bridge
    A road and rail bridge is a structure that spans physical obstacles to simultaneously carry both vehicular road traffic and railway lines across them.
  • E. highway bridge
    A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dd432ec8190969bc32acfc152b1 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:01 p.m.