Triple

T35079210
Position Surface form Disambiguated ID Type / Status
Subject ETF (Eurovia Travaux Ferroviaires) E1012386 entity
Predicate instanceOf P0 FINISHED
Object railway maintenance company C21077 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway maintenance company
Context triple: [ETF (Eurovia Travaux Ferroviaires), instanceOf, railway maintenance company]
  • A. railway construction company
    A railway construction company is an organization that plans, designs, and builds railway infrastructure, including tracks, stations, bridges, and related systems, often coordinating engineering, procurement, and project management activities.
  • B. rolling stock maintenance company chosen
    A rolling stock maintenance company is an organization that inspects, services, repairs, and overhauls railway vehicles such as locomotives, passenger coaches, and freight wagons to ensure their safety, reliability, and regulatory compliance.
  • C. railway holding company
    A railway holding company is a parent corporation that owns and controls one or more railway operating or infrastructure companies, managing their strategic direction and financial interests without necessarily running day-to-day train operations itself.
  • D. rail transport company
    A rail transport company is an organization that owns, operates, or manages trains and railway infrastructure to provide freight and/or passenger transportation services.
  • E. street railway company
    A street railway company is a business entity that owns, operates, and maintains streetcars or trams running on fixed rails along public streets to provide urban passenger transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dd32c008190853aef6028f60208 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:01 p.m.