Triple

T35076234
Position Surface form Disambiguated ID Type / Status
Subject Design Holding E1012315 entity
Predicate instanceOf P0 FINISHED
Object design group C63091 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: design group
Context triple: [Design Holding, instanceOf, design group]
  • A. design team
    A design team is a collaborative group of professionals who combine diverse creative, technical, and strategic skills to research, conceptualize, and produce user-centered design solutions.
  • B. design committee
    A design committee is a group of stakeholders and experts who collaboratively review, guide, and approve design decisions to ensure they meet aesthetic, functional, and strategic goals.
  • C. design bureau
    A design bureau is an organization or department that specializes in planning, developing, and refining product, graphic, or architectural designs, often providing creative and technical solutions for clients or internal projects.
  • D. design association
    A design association is an organized group or entity that connects design professionals, promotes best practices, and advances the interests and standards of the design field.
  • E. architectural group
    An architectural group is a collaborative organization of architects and related professionals who collectively design, plan, and oversee the construction or renovation of built environments.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dd32c008190853aef6028f60208 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:01 p.m.