Triple
T35066605
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Arcadia Oaks Canal |
E1011747
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | fictional waterway |
C40354
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: fictional waterway Context triple: [Arcadia Oaks Canal, instanceOf, fictional waterway]
-
A.
waterway feature
chosen
A waterway feature is any natural or man-made linear or areal element that involves the presence, movement, or containment of water, such as rivers, canals, streams, or channels.
-
B.
navigable waterway
A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
-
C.
baroque waterway
A baroque waterway is an ornately designed canal or watercourse, often integrated into grand landscapes or urban plans, characterized by elaborate curves, decorative features, and dramatic visual perspectives typical of the Baroque style.
-
D.
fictional bridge
A fictional bridge is an imagined or narrative-based structure that symbolically or physically connects places, times, or concepts within a story or conceptual framework.
-
E.
engineered waterway
An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dd193108190af2528186f25b72a |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:01 p.m.