Triple

T3506447
Position Surface form Disambiguated ID Type / Status
Subject Special Training School 103 E74085 entity
Predicate missionTypePrepared P42909 FINISHED
Object behind-the-lines operations LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: behind-the-lines operations | Statement: [Special Training School 103, missionTypePrepared, behind-the-lines operations]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: missionTypePrepared
Context triple: [Special Training School 103, missionTypePrepared, behind-the-lines operations]
  • A. missionPlanning
    Indicates the process of defining, organizing, and coordinating actions or operations needed to achieve a specific mission objective.
  • B. intendedMission chosen
    Indicates that one entity is the planned or designated mission, task, or objective associated with another entity.
  • C. missionName
    Indicates the designated title or label assigned to a specific mission or operation.
  • D. missionStart
    Indicates the point in time or event at which a mission or task officially begins.
  • E. commanderPlanned
    Indicates that a commander formulated or devised a plan for a particular action, operation, or objective.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85ce7a9c81909ddc5cf0cb67a6e3 completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adbbf52bd8819085a2ac5f48cc5c68 completed March 8, 2026, 6:12 p.m.
PD Predicate disambiguation batch_69adae0e770481908528fa35eda53003 completed March 8, 2026, 5:12 p.m.
Created at: March 8, 2026, 3:18 p.m.