Triple

T35041752
Position Surface form Disambiguated ID Type / Status
Subject Petrel E&P software platform E1011088 entity
Predicate instanceOf P0 FINISHED
Object E&P software platform C43486 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: E&P software platform
Context triple: [Petrel E&P software platform, instanceOf, E&P software platform]
  • A. petrel
    A petrel is a seabird adapted for long-distance oceanic flight, characterized by narrow wings, tube-shaped nostrils, and a life spent mostly over open water.
  • B. integrated software platform chosen
    An integrated software platform is a unified system that combines multiple applications and tools into a single environment to streamline workflows, data sharing, and user experience.
  • C. Supply-side platform
    A supply-side platform is a technology system that helps digital publishers manage, optimize, and automate the selling of their advertising inventory across multiple ad exchanges and demand sources.
  • D. oil and gas services company
    An oil and gas services company provides specialized technical, operational, and logistical support to exploration and production firms across the hydrocarbon value chain.
  • E. exploration and production company
    An exploration and production company is a business entity that locates, drills, and extracts oil and natural gas resources from underground reservoirs for commercial sale.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dcea02c81908542a223f6d5059f completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:01 p.m.