Triple

T35029090
Position Surface form Disambiguated ID Type / Status
Subject Galaxy Phase 3 E1010425 entity
Predicate instanceOf P0 FINISHED
Object integrated resort expansion phase C30392 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: integrated resort expansion phase
Context triple: [Galaxy Phase 3, instanceOf, integrated resort expansion phase]
  • A. hotel and casino
    A hotel and casino is an establishment that combines lodging accommodations with on-site gambling facilities, often supplemented by dining, entertainment, and leisure amenities.
  • B. harbour expansion
    Harbour expansion is the planned enlargement and enhancement of a port’s physical infrastructure and operational capacity to accommodate increased maritime traffic, larger vessels, and associated economic activities.
  • C. RollerCoaster Tycoon expansion pack
    A RollerCoaster Tycoon expansion pack is an add-on to the original simulation game that introduces new scenarios, rides, scenery, and gameplay features to enhance and extend the park-building experience.
  • D. expansion chosen
    Expansion is the process or state of increasing in size, scope, quantity, or influence, often by extending beyond original boundaries or limits.
  • E. casino and resort operator
    A casino and resort operator is a business entity that develops, owns, and manages integrated properties combining gambling facilities with lodging, dining, entertainment, and other leisure amenities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dccf0108190af43b465d3750196 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:01 p.m.