Triple
T35027745
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Conwy Railway Bridge |
E1010388
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | tubular bridge |
C61898
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: tubular bridge Context triple: [Conwy Railway Bridge, instanceOf, tubular bridge]
-
A.
T-shaped bridge
A T-shaped bridge is a structure whose deck or roadway forms a “T” configuration, typically consisting of a main span intersected perpendicularly by a shorter cross span or platform.
-
B.
truss bridge
A truss bridge is a type of bridge whose load-bearing superstructure is composed of a framework of interconnected triangular units that efficiently distribute forces through tension and compression.
-
C.
beam bridge
A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
-
D.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
E.
twin-span bridge
A twin-span bridge is a structure composed of two parallel bridge spans, typically used to carry traffic in opposite directions or to increase capacity across a single crossing.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dccf0108190af43b465d3750196 |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:01 p.m.