Triple
T35023020
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | EQUilibriUm Lunar-Earth point 6U Spacecraft |
E1010247
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | interplanetary CubeSat |
C61895
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: interplanetary CubeSat Context triple: [EQUilibriUm Lunar-Earth point 6U Spacecraft, instanceOf, interplanetary CubeSat]
-
A.
interplanetary space mission
An interplanetary space mission is a coordinated endeavor that sends spacecraft from one planet to another to conduct scientific research, exploration, or technology demonstration beyond Earth's immediate environment.
-
B.
spacecraft
A spacecraft is a vehicle or device designed to travel beyond Earth's atmosphere for purposes such as exploration, communication, research, or transportation.
-
C.
6U CubeSat
chosen
A 6U CubeSat is a standardized small satellite composed of six 10×10×10 cm units arranged in a 10×20×30 cm form factor, designed for low-cost, modular space missions.
-
D.
space probe
A space probe is an unmanned spacecraft designed to travel beyond Earth's orbit to collect scientific data about other celestial bodies and the space environment.
-
E.
interplanetary delivery company
An interplanetary delivery company is a logistics organization that transports goods, materials, and packages between planets, managing space routes, schedules, and cargo handling across the solar system.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dccf0108190af43b465d3750196 |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:01 p.m.