Triple

T35023019
Position Surface form Disambiguated ID Type / Status
Subject EQUilibriUm Lunar-Earth point 6U Spacecraft E1010247 entity
Predicate instanceOf P0 FINISHED
Object 6U CubeSat C61895 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 6U CubeSat
Context triple: [EQUilibriUm Lunar-Earth point 6U Spacecraft, instanceOf, 6U CubeSat]
  • A. satellite deployer
    A satellite deployer is a device or mechanism designed to securely hold, transport, and precisely release satellites into their intended orbits or trajectories.
  • B. modular spacecraft
    A modular spacecraft is a reconfigurable space vehicle composed of interchangeable, standardized modules that can be assembled, upgraded, or replaced to support different missions and functions.
  • C. in-situ resource utilization technology demonstrator
    An in-situ resource utilization technology demonstrator is a prototype system designed to test and validate methods for extracting, processing, and using local materials (such as lunar or Martian regolith) to support space missions and reduce dependence on Earth-supplied resources.
  • D. Long Duration Propulsive EELV Secondary Payload Adapter mission
    A Long Duration Propulsive EELV Secondary Payload Adapter mission is a spaceflight that uses a propulsive ESPA ring on an Evolved Expendable Launch Vehicle to carry and operate secondary payloads for extended periods in space, providing independent maneuvering and mission flexibility separate from the primary payload.
  • E. International Space Station truss segment
    An International Space Station truss segment is a structural module that forms part of the station’s backbone, supporting solar arrays, radiators, and utilities while providing attachment points and routing for power, data, and thermal control systems.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dccf0108190af43b465d3750196 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:01 p.m.