Triple

T3500483
Position Surface form Disambiguated ID Type / Status
Subject M25 E73953 entity
Predicate hasJunctionWith P1018 FINISHED
Object M23 motorway E17981 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M23 motorway | Statement: [M25, hasJunctionWith, M23 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M23 motorway
Context triple: [M25, hasJunctionWith, M23 motorway]
  • A. M23 motorway chosen
    The M23 motorway is a major road in South East England linking London to Gatwick Airport and the vicinity of Brighton.
  • B. M96 motorway
    The M96 motorway is a short, little-known British motorway designation that has been used primarily for emergency services training rather than as a public through route.
  • C. M20 motorway
    The M20 motorway is a major road in South East England that connects London to the Channel Tunnel and the ports of Dover, serving as a key route for traffic to and from continental Europe.
  • D. M-9 Motorway
    The M-9 Motorway is a major Pakistani expressway that links the cities of Karachi and Hyderabad in the province of Sindh.
  • E. M27 motorway
    The M27 motorway is a major road in southern England that runs east–west along the south coast, linking the New Forest area with Southampton and Portsmouth.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85cdb6e48190a335d412b9194ed8 completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adbbd4eb308190b84e84261ceec229 completed March 8, 2026, 6:11 p.m.
NED1 Entity disambiguation (via context triple) batch_69b373d88dc08190a8508f990b01cf03 completed March 13, 2026, 2:18 a.m.
Created at: March 8, 2026, 3:18 p.m.