Triple

T35004571
Position Surface form Disambiguated ID Type / Status
Subject Galaxy Phase 2 E1009775 entity
Predicate instanceOf P0 FINISHED
Object integrated resort expansion C30392 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: integrated resort expansion
Context triple: [Galaxy Phase 2, instanceOf, integrated resort expansion]
  • A. hotel and casino
    A hotel and casino is an establishment that combines lodging accommodations with on-site gambling facilities, often supplemented by dining, entertainment, and leisure amenities.
  • B. harbour expansion
    Harbour expansion is the planned enlargement and enhancement of a port’s physical infrastructure and operational capacity to accommodate increased maritime traffic, larger vessels, and associated economic activities.
  • C. expansion chosen
    Expansion is the process or state of increasing in size, scope, quantity, or influence, often by extending beyond original boundaries or limits.
  • D. RollerCoaster Tycoon expansion pack
    A RollerCoaster Tycoon expansion pack is an add-on to the original simulation game that introduces new scenarios, rides, scenery, and gameplay features to enhance and extend the park-building experience.
  • E. casino and resort operator
    A casino and resort operator is a business entity that develops, owns, and manages integrated properties combining gambling facilities with lodging, dining, entertainment, and other leisure amenities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dcb716881909f75e4fd60ab2284 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:01 p.m.