Triple

T34965216
Position Surface form Disambiguated ID Type / Status
Subject Frail Sister E1008373 entity
Predicate instanceOf P0 FINISHED
Object hybrid visual-literary work C30163 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hybrid visual-literary work
Context triple: [Frail Sister, instanceOf, hybrid visual-literary work]
  • A. visual essay collection chosen
    A visual essay collection is a curated set of image-driven essays that combine visuals and text to explore ideas, narratives, or themes in a cohesive, interpretive format.
  • B. literaryWork
    A literaryWork is a created written or spoken artistic composition, such as a novel, poem, or play, that conveys ideas, stories, or emotions through language.
  • C. aphoristic work
    An aphoristic work is a composition structured as a series of concise, often witty statements that express general truths, observations, or philosophical insights rather than a continuous narrative or argument.
  • D. literary-musical construct
    A literary-musical construct is a conceptual form that fuses narrative or poetic text with musical structure to create a unified expressive work.
  • E. creativeWork
    A creativeWork is an original intellectual or artistic production—such as a book, film, painting, song, or software—that expresses creativity and can be shared, distributed, or experienced by others.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dc69564819099e9e78aed6ff0a6 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4 p.m.