Triple
T34957030
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Emacs distributions |
E1008144
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Emacs ecosystem concept |
C16049
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Emacs ecosystem concept Context triple: [Emacs distributions, instanceOf, Emacs ecosystem concept]
-
A.
Emacs package
An Emacs package is a modular collection of Emacs Lisp code that extends or customizes the functionality of the Emacs text editor.
-
B.
software ecosystem
chosen
A software ecosystem is a dynamic network of interdependent software products, platforms, tools, developers, and users that co-evolve, interact, and create value through shared standards, integrations, and marketplaces.
-
C.
extensible editor
An extensible editor is a text or code editing environment designed with a flexible architecture that allows users to add, modify, and integrate new features or behaviors through plugins, scripts, or configuration.
-
D.
software and services ecosystem
A software and services ecosystem is an interconnected network of applications, platforms, tools, and providers that collaboratively deliver integrated digital capabilities and value to users and organizations.
-
E.
Eclipse project
An Eclipse project is a structured collection of source files, configuration settings, and resources managed within the Eclipse IDE to develop, build, and run software applications.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dc69564819099e9e78aed6ff0a6 |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4 p.m.