Triple
T34956911
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Emacs package.el |
E1008142
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Emacs package manager |
C7090
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Emacs package manager Context triple: [Emacs package.el, instanceOf, Emacs package manager]
-
A.
Emacs package
An Emacs package is a modular collection of Emacs Lisp code that extends or customizes the functionality of the Emacs text editor.
-
B.
software package manager
chosen
A software package manager is a tool that automates the discovery, installation, updating, configuration, and removal of software packages and their dependencies in a consistent and reliable way.
-
C.
JavaScript package manager
A JavaScript package manager is a tool that automates the discovery, installation, updating, and dependency management of JavaScript libraries and frameworks for a project.
-
D.
software package repository
A software package repository is a centralized storage and distribution system that hosts, organizes, and provides access to software packages and their metadata for installation, update, and dependency management.
-
E.
Node.js package manager
A Node.js package manager is a tool that automates the installation, updating, configuration, and management of reusable JavaScript libraries and dependencies for Node.js applications.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dc69564819099e9e78aed6ff0a6 |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4 p.m.