Triple

T3492761
Position Surface form Disambiguated ID Type / Status
Subject Defense Support Program E73775 entity
Predicate instanceOf P0 FINISHED
Object early-warning satellite system C9200 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: early-warning satellite system
Context triple: [Defense Support Program, instanceOf, early-warning satellite system]
  • A. polar-orbiting weather satellite program
    A polar-orbiting weather satellite program is a coordinated system of satellites in near-polar orbits that provide global, high-resolution observations of atmospheric, oceanic, and surface conditions for weather forecasting and climate monitoring.
  • B. public warning system
    A public warning system is an organized infrastructure of technologies, protocols, and communication channels designed to rapidly alert and inform the public about imminent or ongoing emergencies and hazards.
  • C. satellite program chosen
    A satellite program is an organized initiative that designs, builds, launches, and operates satellites to achieve specific objectives such as communication, Earth observation, navigation, or scientific research.
  • D. Global Navigation Satellite System
    A Global Navigation Satellite System is a satellite-based infrastructure that provides continuous, worldwide positioning, navigation, and timing services to receivers on or near Earth’s surface.
  • E. geostationary communications satellite
    A geostationary communications satellite is a spacecraft positioned in an equatorial orbit that matches Earth's rotation, remaining fixed over one longitude to relay telecommunications signals between ground stations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85cca8d4819088494e9f3340fab5 completed March 8, 2026, 2:21 p.m.
Created at: March 8, 2026, 3:18 p.m.