Triple

T34901878
Position Surface form Disambiguated ID Type / Status
Subject Project Riese E1006612 entity
Predicate instanceOf P0 FINISHED
Object Nazi Germany construction project C57812 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Nazi Germany construction project
Context triple: [Project Riese, instanceOf, Nazi Germany construction project]
  • A. Nazi architecture project
    A Nazi architecture project is a large-scale building or urban planning initiative designed under the Third Reich to embody and propagate Nazi ideology through monumental, authoritarian, and neoclassical forms.
  • B. Nazi military installation chosen
    A Nazi military installation is a facility established and operated by the German armed forces under the Nazi regime for purposes such as training, command, logistics, weapons development, or the launching and support of military operations.
  • C. institution of Nazi Germany
    An institution of Nazi Germany is any formal organization, governmental body, or structured system established or co-opted by the Nazi regime to implement, enforce, or propagate its totalitarian, racist, and expansionist policies between 1933 and 1945.
  • D. Nazi military operation
    A Nazi military operation is a planned and coordinated action conducted by the armed forces of Nazi Germany to achieve specific strategic, tactical, or political objectives during its period of rule, particularly in World War II.
  • E. German Army facility
    A German Army facility is a designated military installation used by the German Army for training, operations, administration, logistics, or support activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dc1b4a081909b4c6e4d8ec0aa2d completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4 p.m.