Triple
T34901878
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Project Riese |
E1006612
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Nazi Germany construction project |
C57812
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Nazi Germany construction project Context triple: [Project Riese, instanceOf, Nazi Germany construction project]
-
A.
Nazi architecture project
A Nazi architecture project is a large-scale building or urban planning initiative designed under the Third Reich to embody and propagate Nazi ideology through monumental, authoritarian, and neoclassical forms.
-
B.
Nazi military installation
chosen
A Nazi military installation is a facility established and operated by the German armed forces under the Nazi regime for purposes such as training, command, logistics, weapons development, or the launching and support of military operations.
-
C.
institution of Nazi Germany
An institution of Nazi Germany is any formal organization, governmental body, or structured system established or co-opted by the Nazi regime to implement, enforce, or propagate its totalitarian, racist, and expansionist policies between 1933 and 1945.
-
D.
Nazi military operation
A Nazi military operation is a planned and coordinated action conducted by the armed forces of Nazi Germany to achieve specific strategic, tactical, or political objectives during its period of rule, particularly in World War II.
-
E.
German Army facility
A German Army facility is a designated military installation used by the German Army for training, operations, administration, logistics, or support activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dc1b4a081909b4c6e4d8ec0aa2d |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4 p.m.