Triple
T34888529
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Montreal–Quebec City |
E1006216
|
entity |
| Predicate | hasRailElectrificationStatus |
P59679
|
FINISHED |
| Object | mostly non-electrified |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: mostly non-electrified | Statement: [Montreal–Quebec City, hasRailElectrificationStatus, mostly non-electrified]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hasRailElectrificationStatus Context triple: [Montreal–Quebec City, hasRailElectrificationStatus, mostly non-electrified]
-
A.
railElectrificationIncludes
Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
-
B.
hasElectrificationStatus
chosen
Indicates that an entity possesses a specified type or level of electrification (e.g., electrified, non-electrified, partially electrified).
-
C.
railwayElectrificationDate
Indicates the date on which a railway line or section was electrified and put into electric operation.
-
D.
isElectricRailway
Indicates that a given railway system operates using electric power rather than diesel or other forms of propulsion.
-
E.
electrificationTerminusOf
Indicates that a location or point serves as the end of an electrified section of a route, line, or network.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dbedb288190afe5780710847410 |
completed | May 3, 2026, 3:46 p.m. |
| NER | Named-entity recognition | batch_69fd485f57dc8190820365396d041991 |
completed | May 8, 2026, 2:20 a.m. |
| PD | Predicate disambiguation | batch_69fd47d35da081908bec8901018d186c |
completed | May 8, 2026, 2:17 a.m. |
Created at: May 3, 2026, 4 p.m.