Triple

T34888529
Position Surface form Disambiguated ID Type / Status
Subject Montreal–Quebec City E1006216 entity
Predicate hasRailElectrificationStatus P59679 FINISHED
Object mostly non-electrified LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: mostly non-electrified | Statement: [Montreal–Quebec City, hasRailElectrificationStatus, mostly non-electrified]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasRailElectrificationStatus
Context triple: [Montreal–Quebec City, hasRailElectrificationStatus, mostly non-electrified]
  • A. railElectrificationIncludes
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • B. hasElectrificationStatus chosen
    Indicates that an entity possesses a specified type or level of electrification (e.g., electrified, non-electrified, partially electrified).
  • C. railwayElectrificationDate
    Indicates the date on which a railway line or section was electrified and put into electric operation.
  • D. isElectricRailway
    Indicates that a given railway system operates using electric power rather than diesel or other forms of propulsion.
  • E. electrificationTerminusOf
    Indicates that a location or point serves as the end of an electrified section of a route, line, or network.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dbedb288190afe5780710847410 completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69fd485f57dc8190820365396d041991 completed May 8, 2026, 2:20 a.m.
PD Predicate disambiguation batch_69fd47d35da081908bec8901018d186c completed May 8, 2026, 2:17 a.m.
Created at: May 3, 2026, 4 p.m.