Triple

T3485590
Position Surface form Disambiguated ID Type / Status
Subject Rajang River E73598 entity
Predicate hasHydroelectricProjectOnTributary P32893 FINISHED
Object Murum Dam on Murum River
Murum Dam on Murum River is a major hydroelectric dam in Sarawak, Malaysia, forming part of the Rajang River basin’s cascade of power projects.
E361160 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Murum Dam on Murum River | Statement: [Rajang River, hasHydroelectricProjectOnTributary, Murum Dam on Murum River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Murum Dam on Murum River
Context triple: [Rajang River, hasHydroelectricProjectOnTributary, Murum Dam on Murum River]
  • A. Bargi Dam
    Bargi Dam is a major multipurpose dam built on the Narmada River in Madhya Pradesh, India, primarily used for irrigation, hydropower generation, and flood control.
  • B. Surobi Dam
    Surobi Dam is a hydroelectric and irrigation dam located on the Kabul River in eastern Afghanistan.
  • C. Lodoyo Dam
    Lodoyo Dam is a water control and irrigation structure located on the Brantas River in East Java, Indonesia.
  • D. Jebba Dam
    Jebba Dam is a major hydroelectric power facility in Nigeria that harnesses the flow of the Niger River to generate electricity and support regional water management.
  • E. Wlingi Dam
    Wlingi Dam is a hydroelectric and irrigation dam located on the Brantas River in East Java, Indonesia.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Murum Dam on Murum River
Triple: [Rajang River, hasHydroelectricProjectOnTributary, Murum Dam on Murum River]
Generated description
Murum Dam on Murum River is a major hydroelectric dam in Sarawak, Malaysia, forming part of the Rajang River basin’s cascade of power projects.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Murum Dam on Murum River
Target entity description: Murum Dam on Murum River is a major hydroelectric dam in Sarawak, Malaysia, forming part of the Rajang River basin’s cascade of power projects.
  • A. Bargi Dam
    Bargi Dam is a major multipurpose dam built on the Narmada River in Madhya Pradesh, India, primarily used for irrigation, hydropower generation, and flood control.
  • B. Surobi Dam
    Surobi Dam is a hydroelectric and irrigation dam located on the Kabul River in eastern Afghanistan.
  • C. Lodoyo Dam
    Lodoyo Dam is a water control and irrigation structure located on the Brantas River in East Java, Indonesia.
  • D. Jebba Dam
    Jebba Dam is a major hydroelectric power facility in Nigeria that harnesses the flow of the Niger River to generate electricity and support regional water management.
  • E. Wlingi Dam
    Wlingi Dam is a hydroelectric and irrigation dam located on the Brantas River in East Java, Indonesia.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85cca8d4819088494e9f3340fab5 completed March 8, 2026, 2:21 p.m.
NER Named-entity recognition batch_69adbb8f205c8190aa6f7484ebad14bb completed March 8, 2026, 6:10 p.m.
NED1 Entity disambiguation (via context triple) batch_69b368248f9c81908a1905a705e57c53 completed March 13, 2026, 1:28 a.m.
NEDg Description generation batch_69b36a2231008190820b0c50ad2d661a completed March 13, 2026, 1:36 a.m.
NED2 Entity disambiguation (via description) batch_69b36a8dae1481908b10a966ebcf89b2 completed March 13, 2026, 1:38 a.m.
Created at: March 8, 2026, 3:18 p.m.