Triple
T34846675
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | M+ Cinema |
E1004489
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | museum cinema |
C5155
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: museum cinema Context triple: [M+ Cinema, instanceOf, museum cinema]
-
A.
film museum
chosen
A film museum is a cultural institution that collects, preserves, and exhibits films, cinematic artifacts, and related media to educate and engage the public with the history and art of cinema.
-
B.
theatre museum
A theatre museum is a cultural institution that collects, preserves, and exhibits artifacts, documents, and multimedia related to the history, practice, and evolution of theatrical performance.
-
C.
cinema
A cinema is a venue equipped with large screens, projection and sound systems, where audiences gather to watch films in a shared, theatrical setting.
-
D.
film exhibition infrastructure project
A film exhibition infrastructure project is a coordinated initiative to design, build, upgrade, or network physical and digital venues, technologies, and support systems that enable the public screening and distribution of films.
-
E.
museum exhibition
A museum exhibition is a curated public display of objects, artifacts, or artworks organized around a specific theme, narrative, or concept to educate and engage visitors.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76db97714819099b5bed36fd64e9d |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4 p.m.