Triple

T34846675
Position Surface form Disambiguated ID Type / Status
Subject M+ Cinema E1004489 entity
Predicate instanceOf P0 FINISHED
Object museum cinema C5155 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: museum cinema
Context triple: [M+ Cinema, instanceOf, museum cinema]
  • A. film museum chosen
    A film museum is a cultural institution that collects, preserves, and exhibits films, cinematic artifacts, and related media to educate and engage the public with the history and art of cinema.
  • B. theatre museum
    A theatre museum is a cultural institution that collects, preserves, and exhibits artifacts, documents, and multimedia related to the history, practice, and evolution of theatrical performance.
  • C. cinema
    A cinema is a venue equipped with large screens, projection and sound systems, where audiences gather to watch films in a shared, theatrical setting.
  • D. film exhibition infrastructure project
    A film exhibition infrastructure project is a coordinated initiative to design, build, upgrade, or network physical and digital venues, technologies, and support systems that enable the public screening and distribution of films.
  • E. museum exhibition
    A museum exhibition is a curated public display of objects, artifacts, or artworks organized around a specific theme, narrative, or concept to educate and engage visitors.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76db97714819099b5bed36fd64e9d completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4 p.m.