Triple
T34844433
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Arrow Electronics |
E1004427
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electronics distributor |
C33274
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electronics distributor Context triple: [Arrow Electronics, instanceOf, electronics distributor]
-
A.
hardware retailer
A hardware retailer is a business that sells tools, building materials, and related supplies to consumers and professionals for construction, repair, and maintenance projects.
-
B.
electronics hub
An electronics hub is a centralized platform or location where various electronic components, devices, tools, and related services are gathered, distributed, or managed for users, hobbyists, and professionals.
-
C.
distribution company
chosen
A distribution company is a business entity that purchases products from manufacturers or suppliers and efficiently stores, manages, and delivers them to retailers, wholesalers, or end customers within a defined supply chain network.
-
D.
electronics components manufacturer
An electronics components manufacturer is a company that designs, fabricates, and supplies electronic parts such as semiconductors, capacitors, resistors, and connectors for use in a wide range of electronic devices and systems.
-
E.
wholesale distribution company
A wholesale distribution company purchases goods in large quantities from manufacturers or suppliers and resells them in bulk to retailers, businesses, or other intermediaries, typically without selling directly to end consumers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76db97714819099b5bed36fd64e9d |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4 p.m.