Triple

T34843859
Position Surface form Disambiguated ID Type / Status
Subject SEC Tournament MVP E1004412 entity
Predicate awardedForPhase P19556 FINISHED
Object conference tournament LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: conference tournament | Statement: [SEC Tournament MVP, awardedForPhase, conference tournament]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: awardedForPhase
Context triple: [SEC Tournament MVP, awardedForPhase, conference tournament]
  • A. awardForPhase chosen
    Indicates that an award is given specifically in connection with, or as a result of, a particular phase of a process or project.
  • B. awardedDuring
    Indicates that an award or honor was given to an entity within a specified time period or event.
  • C. awardedWhen
    Indicates the time or condition under which an award or recognition is given to an entity.
  • D. awardedSince
    Indicates that an entity has been receiving a particular award continuously from a specified starting time onward.
  • E. isAwardedWithin
    Indicates that an award or recognition is granted to an entity within a specified context, scope, or time frame.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76db97714819099b5bed36fd64e9d completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69fd6f9d600c8190acf495b7fc632e4b completed May 8, 2026, 5:07 a.m.
PD Predicate disambiguation batch_69fd6e98a2948190a9f78c415ad23b8c completed May 8, 2026, 5:03 a.m.
Created at: May 3, 2026, 4 p.m.