Triple

T3483599
Position Surface form Disambiguated ID Type / Status
Subject Niger State E73553 entity
Predicate knownFor P22 FINISHED
Object Jebba Dam E158900 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jebba Dam | Statement: [Niger State, knownFor, Jebba Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Jebba Dam
Context triple: [Niger State, knownFor, Jebba Dam]
  • A. Jebba Dam chosen
    Jebba Dam is a major hydroelectric power facility in Nigeria that harnesses the flow of the Niger River to generate electricity and support regional water management.
  • B. Betania Dam
    Betania Dam is a major hydroelectric dam and reservoir in Colombia, known for generating power and supporting irrigation and aquaculture in the Huila region.
  • C. Itezhi-Tezhi Dam
    Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
  • D. Wayatinah Dam
    Wayatinah Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s major power generation scheme.
  • E. Almatti Dam
    Almatti Dam is a major hydroelectric and irrigation dam in Karnataka, India, built across the Krishna River as part of the Upper Krishna Project.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad85b3c9b08190857cae74c7f36da9 completed March 8, 2026, 2:20 p.m.
NER Named-entity recognition batch_69adbb781e9c8190810fdd814f506127 completed March 8, 2026, 6:10 p.m.
NED1 Entity disambiguation (via context triple) batch_69b3bb7a4e5481908322a2f0c1bf8119 completed March 13, 2026, 7:23 a.m.
Created at: March 8, 2026, 3:17 p.m.