Triple

T34834485
Position Surface form Disambiguated ID Type / Status
Subject São Paulo bus system E1004161 entity
Predicate instanceOf P0 FINISHED
Object bus rapid transit network C31035 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bus rapid transit network
Context triple: [São Paulo bus system, instanceOf, bus rapid transit network]
  • A. rapid transit network
    A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
  • B. bus rapid transit line
    A bus rapid transit line is a high-capacity bus corridor that uses dedicated lanes, priority signaling, and streamlined stations to provide fast, reliable, rail-like transit service.
  • C. bus rapid transit facility
    A bus rapid transit facility is a dedicated infrastructure element—such as stations, lanes, and terminals—designed to support high-capacity, fast, and reliable bus-based public transportation.
  • D. bus service network chosen
    A bus service network is an interconnected system of bus routes, stops, schedules, and vehicles designed to transport passengers efficiently across a defined geographic area.
  • E. bus rapid transit station group
    A bus rapid transit station group is a coordinated set of closely spaced BRT stations or platforms that function together as a single operational unit to serve high-capacity, high-frequency bus services along a corridor.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76db7d1b4819093bd4912d80d845d completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4 p.m.