Triple

T34814223
Position Surface form Disambiguated ID Type / Status
Subject Meshginshahr suspension bridge E1003582 entity
Predicate instanceOf P0 FINISHED
Object glass-bottom bridge C62108 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: glass-bottom bridge
Context triple: [Meshginshahr suspension bridge, instanceOf, glass-bottom bridge]
  • A. ornamental bridge
    An ornamental bridge is a decorative structure, often smaller in scale than functional bridges, designed primarily to enhance the aesthetic appeal of a landscape or garden while sometimes providing light pedestrian passage.
  • B. covered bridge
    A covered bridge is a typically wooden, roofed structure that spans a waterway or gap, enclosing its roadway to protect the supporting framework from weather and extend its lifespan.
  • C. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • D. pedestrian skybridge
    A pedestrian skybridge is an elevated, enclosed or open walkway that connects two or more buildings above ground level, allowing people to cross safely and conveniently without interacting with street traffic.
  • E. arched bridge
    An arched bridge is a structure that spans a physical obstacle using one or more curved arches that transfer loads primarily through compression into its supports.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76db600b88190989abdf08fce3b27 completed May 3, 2026, 3:45 p.m.
Created at: May 3, 2026, 3:59 p.m.