Triple

T34806921
Position Surface form Disambiguated ID Type / Status
Subject Copper Museum in Legnica E1003384 entity
Predicate instanceOf P0 FINISHED
Object copper museum C20130 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: copper museum
Context triple: [Copper Museum in Legnica, instanceOf, copper museum]
  • A. ecomuseum
    An ecomuseum is a community-driven, place-based museum concept that preserves and interprets the natural, cultural, and historical heritage of a living territory through in situ sites, landscapes, and local participation rather than a single centralized building.
  • B. craft museum chosen
    A craft museum is a cultural institution dedicated to collecting, preserving, and exhibiting handmade objects and traditional or contemporary craft practices, often highlighting materials, techniques, and regional or cultural craftsmanship.
  • C. 박물관
    박물관은 역사적·문화적·과학적·예술적 가치가 있는 유물과 자료를 수집·보존·연구·전시하여 대중에게 교육과 문화 향유의 기회를 제공하는 기관이다.
  • D. gin museum
    A gin museum is a curated space that preserves, interprets, and exhibits the history, production processes, cultural significance, and artifacts related to gin and its distillation.
  • E. museum branch
    A museum branch is a subsidiary location of a larger museum organization that houses and presents part of its collections, exhibitions, and programs to serve a specific geographic area or audience.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76db600b88190989abdf08fce3b27 completed May 3, 2026, 3:45 p.m.
Created at: May 3, 2026, 3:59 p.m.